Client: Brockelsby Hall Estate

Location: Brockels Estateby Hall

Boiler: 199kw boiler

 

For this project it was determined that a 199kw wood chip boiler would be the perfect solution for their heating and hot water needs, with the wood chip boiler complimenting the estates natural resources.

We installed a 150m district heating network to connect the pool and courtyard cottages, then modified there existing system to connect the district heating network, main house and new biomass boiler into a new low loss header while keeping their existing boilers as a backup system.